aircraft:wb7_archangel
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| aircraft:wb7_archangel [2025/09/20 03:08] – admin | aircraft:wb7_archangel [2025/11/24 17:28] (current) – admin | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| | {{aircraft: | | {{aircraft: | ||
| | **Role** | High supersonic bomber | | | **Role** | High supersonic bomber | | ||
| - | | **National origin** | Wingarde | | + | | **National origin** |
| - | | **Manufacturer** | Wingarde Aerospace | | + | | **Manufacturer** |
| | **First flight** | 19 June 2008 | | | **First flight** | 19 June 2008 | | ||
| | **Introduction** | 28 September 2010 | | | **Introduction** | 28 September 2010 | | ||
| | **Status** | In service | | | **Status** | In service | | ||
| - | | **Primary user** | [[: | + | | **Primary user** | [[orgs: |
| | **Produced** | 2010-2024 | | | **Produced** | 2010-2024 | | ||
| </ | </ | ||
| - | The **WB.7 Archangel** ([[wp> | + | The **WB.7 Archangel** ([[wp> |
| To achieve its impressive Mach 4 supercruise, | To achieve its impressive Mach 4 supercruise, | ||
| Line 22: | Line 22: | ||
| Beginning in 2005, its development was shrouded in secrecy, but was plagued by ballooning costs and overruns as planners and policymakers struggled to finalize a design suited to the realities of evolving air warfare. The WB.7 entered limited production and was introduced in 2010. | Beginning in 2005, its development was shrouded in secrecy, but was plagued by ballooning costs and overruns as planners and policymakers struggled to finalize a design suited to the realities of evolving air warfare. The WB.7 entered limited production and was introduced in 2010. | ||
| - | With advancing air defence technology threatening the Archangel' | + | With advancing air defence technology threatening the Archangel' |
| As of 2025, after the Phase II upgrade, the cost per airframe is estimated to be approximately $1.2 billion USD. | As of 2025, after the Phase II upgrade, the cost per airframe is estimated to be approximately $1.2 billion USD. | ||
| - | Only a very limited number of Archangel squadrons exist, officially under the Federal Air Force. Due to the stringent requirement for elite crews, however, available slots are hotly contested between Air Force and [[: | + | Only a very limited number of Archangel squadrons exist, officially under the Federal Air Force. Due to the stringent requirement for elite crews, however, available slots are hotly contested between Air Force and [[orgs: |
| ===== Variants ===== | ===== Variants ===== | ||
| ***Phase I** (2010)**:** Original production model, rapid deployment high supersonic bomber. | ***Phase I** (2010)**:** Original production model, rapid deployment high supersonic bomber. | ||
| - | ***Phase II** (2023)**:** Hypersonic strike capability upgrade, making use of the Tyrfing | + | ***Phase II** (2023)**:** Hypersonic strike capability upgrade, making use of the Gungnir |
| ===== Specifications (WB.7 Archangel, Phase II) ===== | ===== Specifications (WB.7 Archangel, Phase II) ===== | ||
| Line 43: | Line 43: | ||
| ***[[wp> | ***[[wp> | ||
| ***[[wp> | ***[[wp> | ||
| - | ***[[wp> | + | ***[[wp> |
| ==== Performance ==== | ==== Performance ==== | ||
| Line 55: | Line 55: | ||
| ***Bombs: | ***Bombs: | ||
| - | *[[:ordnance|MB40-160P/ | + | *[[ordnance|MB40-160P/ |
| ***Missiles: | ***Missiles: | ||
| - | *[[:ordnance:hsr_360_tyrfing|HSR-360 | + | *[[ordnance: |
| - | *[[:ordnance: | + | *[[ordnance: |
| - | *[[:ordnance: | + | *[[ordnance: |
| - | *[[:ordnance: | + | *[[ordnance: |
| ***Common loadouts:** | ***Common loadouts:** | ||
| - | ***Hypersonic strike** (Phase II)**:** 4 × HSR-360 | + | ***Hypersonic strike** (Phase II)**:** 4 × HSR-360 |
| ***Precision bomber:** 16 or 8 × MB40P/A/G (500 kg) or MB80P/A/G (1,000 kg) guided bombs with high speed release fairings, 2 × AR-L-168 Balliste extreme range air-to-air missiles | ***Precision bomber:** 16 or 8 × MB40P/A/G (500 kg) or MB80P/A/G (1,000 kg) guided bombs with high speed release fairings, 2 × AR-L-168 Balliste extreme range air-to-air missiles | ||
| ***Strategic interceptor: | ***Strategic interceptor: | ||
aircraft/wb7_archangel.1758337711.txt.gz · Last modified: by admin
